HOME>PRODUCTS > SOLUTION >Raw material capactiy 200-300tph gold separating plant

Raw material capactiy 200-300tph gold separating plant

gold mining machine

Raw material capactiy 200-300tph gold separating plant with knelson series centrifuge
Material size below 6mm capacity:80-100tph
Recovery over 90% to visible and single crystal gold

Gold mining machine technical process
Raw material from excavator into vibrating feed hopper then well-distributed transported by conveyor to reamers trommel screen to be classified into big size>6mm and small size≤6mm,the one in size >6mm into fixed sluice to get the gold,the scrap into scrap material;
The small getting into 1set 1200#horizontal gold concentrator from 1set 4inch sand pump,the concentrate into concentrate box,the scrap into scrap pool.

Gold mining machine detail parameter


Production


Specification


Quantity


Power


Remark


Vibrating feed hopper

2200*3000

1SET

0.38


Including shaking feeder


Transport conveyor


Belt width600mm,pole length about 9m

1PCS

5.5


Reamer trommel screen


Inner dia.:1.3m,outer dia.:1.6m,
Screen mesh 3m,including reamers,driven by chain

1SET

7.5


Fixed sluice with carpet

1000*4000

1SET

-


Including gold carpet,brand Mitsubishi


Mineral box and sand pump


4inch sand pump

1SET

11


Gold concentrator


Horizontal automatic discharge

knelson series centrifuge concentrator

1SET

21.5


Plc control automatic discharge


Centrifugal pump

5.5KW

1SET

5.5


Submerged
pump

5.5KW

1SET

5.5


Electric box

1PCS

-


Total power

56.88KW

产品分类

/PRODUCTS

联系我们

/CONTACT

Qingzhou Guancheng Heavy Industrial Machinery Co.,Ltd.

+86 536 3593111

地址:Dongjiande Village, Huanglou Street Office, Qingzhou, Shandong, China (Mainland)

电话:+86 536 3593111

传真:+86 536 3593111

手机:+86 15653473333,15053659999

Email:1592999333@qq.com

Qingzhou Guancheng Heavy Industrial Machinery  Co.,Ltd.鲁ICP备09020970号-29
鲁ICP备09020970号-29