50ton/hour rock gold mine separating plant
1.Gold mining machine technical process
The Raw material into feed hopper then into shaking feeder then well distributed into the jaw crusher 500-750# to be crushing then mineral getting into reversible conveyor to be secondary crushing from reversible conveyor,the crushed mineral getting into ball mill to be grinding then into spiral classifier the mineral size≤6mm into 2set 1200# horizontal automatic discharge centrifugal concentrator to get gold concentrate,the tailings into 6s shaking table to be secondary gold separating.
The gold concentrator from horizontal gold concentrator into gold amalgamator to get pure gold.
2.Gold mining machine detail parameter
-
2745ball mill specifications
Motor:JR-8-570kw-10000v/380v Brand:Handan sida/sanyang kaitai,china
Reducer:ZD80(forging steel shell) Brand:Zibo xinxing
Gearwheel the small one:Material forging steel 45# High-frequency quenching
Gearwheel the big one:Material forging steel 45# Width320mm
The cover of barrel body:Material forging steel 35# Thickness≥60mm
Main bearing:30031-1000 Brand:Wafangdian bearing manufacturing co.,ltd
Thickness of barrel body :25mm
High manganese steel liner:1pcs,Material of Mn13 Thickness50mm-70mm
Overall pinion plate: high - strength and stable 1pcs
Overall steel bottom frame: (the type no need installation for debugging ) 1pcs;400#U steel
Starting control cabinet: 1set
Drum feeder: 1 set double spiral reinforced
Steel ball needed:35ton
-
2400x13000 spiral classifier
The thickness of the channel(tank) is 8mm*2;
Main spindle 425x25mm,seamless steel tube*2;
Spindle bracket 12mm;Large blade 8mm;
Small blade polyurethane main reducer ZL65*2;
Main motor Y-6-22kw*2;
Length of channel(tank): 11500mm;Spindle bearing drive,Lift motor 4kw*2, lift reducer WXJ180*2 Lift motor4KW*2
- Mobile gold car gold mining machine on manufactruing
- Fixed gold mining machine 300 m3/hour alluvial gold mining
- The gold mining equipment mobile concentrator car send to Indonesia
- Affect reason rock gold mine fully crushing&grinding
- The gold mine and separating in Democratic republic of Congo
- Work capacity 100-150ton/hour vibrating gold mining machine
- Stationary type vibrating screen gold mining machine
- Desert gold mining machine dry gold separating plant
- Container Loading:Mobile gold mining machine send
产品分类
/PRODUCTS推荐产品
/PRODUCTS推荐文章
/NEWS- Facts About Environmental Equipment
- To Focus on the Wearing Parts of Roller Crusher
- Some Tips to the Application of the Lubrication of Impact Crusher
- The Development of VSI Crusher Solves the Shortage of the Artificial Sand
联系我们
/CONTACTQingzhou Guancheng Heavy Industrial Machinery Co.,Ltd.
+86 536 3593111
地址:Dongjiande Village, Huanglou Street Office, Qingzhou, Shandong, China (Mainland)
电话:+86 536 3593111
传真:+86 536 3593111
手机:+86 15653473333,15053659999
Email:1592999333@qq.com