HOME>NEWS>Product Knowledge>200-300tph alluvial gold mining machine

200-300tph alluvial gold mining machine

gold mining machine

Gold mining machinetechnical process
The raw material into feed hopper by excavator,then high pressure water swilling into reamers trommel screen to be classified into 2size,the big one ans small one,the one in big size into one fixed gold sluice with carpet,the scrap get rid into the scrap pool;
The material in small size into mineral dewater machine by sand pump ,then into mineral box sending to 1200#automatic discharge gold concentrator to be separating finally the concentrate get from concentrate discharge pipe and scrap to get rid into scrap pool.
Gold mining machine detailParameter

Production

 Specification

Quantity

Power

 Remark


 Feed hopper

3500*5500  10mm thick steel

1set

-

 

Trommel screen

Reamers trommel screen

inner dia.:1.3m(punch manufacturing)outer dia:1.6m,screen mesh 3m,including reamers all over the trommel,2 pcs chain driving, central+sides water supplying

1set

7.5

including the hopper,holding frames

Mineral deslining machine

2000*3800

1set

4.4

 

Polyurethane mesh

Gold concentrator

1200#automatic discharge concentrator

1set

21.5

PLC control

Mineral box and sand pump

4inch sand pump 11KW

2pcs

22

 

Centrifugal  pump

 

1pcs

5.5

 

Submerged pump

5.5KW

2pcs

11

 

Electric box

 

1pcs

-

 

Total power

71.9KW

Generate  set

 Production

Specification

Quantity

 Power

Remark

Generate set

150KW Yuchai brand

1set

-

 

产品分类

/PRODUCTS

推荐产品

/PRODUCTS

联系我们

/CONTACT

Qingzhou Guancheng Heavy Industrial Machinery Co.,Ltd.

+86 536 3593111

地址:Dongjiande Village, Huanglou Street Office, Qingzhou, Shandong, China (Mainland)

电话:+86 536 3593111

传真:+86 536 3593111

手机:+86 15653473333,15053659999

Email:1592999333@qq.com

Qingzhou Guancheng Heavy Industrial Machinery  Co.,Ltd.鲁ICP备09020970号-29
鲁ICP备09020970号-29