Working capacity 100-150ton/hour dredging depth 25m gold mining machine dredger
Gold mining machine dredger technical process
The material from the bucket transported into the trommel screen with reamers which can ream and wash the clay off,then classified into 3sizes ≤6mm,6-15mm,>15mm,the biggest size material >15mm useless are directly discharged to waste area by scrap sluice;
6-15mm material into shaking sluice to get gold nugget, scrap material discharged into the waste area;
The material <6mm getting into the material box through sand pump feeding into a horizontal automatic discharge gold concentrator,then concentrate get into concentrator box, scrap material to be get rid.
Gold mining machine dredger detail parameter
Production Name |
Specifications |
Quantity |
Power |
Remark |
Pontoon |
Single width 2m,height 1.15m,Length 47m |
1set |
- |
|
Bucket system |
Main frame height:5.6m Double 16#U steel |
1set |
75 |
|
Trommel screen |
The trommel fixed with Reamers: length 2.2m |
1set |
7.5 |
|
Gold concentrator |
1200#Horizontal automatic discharging gold concentrator |
1set |
21.5 |
PLC control |
Shaking sluice |
1350*4500mm |
1pcs |
3 |
|
Arms winding engine |
650#reducer |
1pcs |
18.5 |
|
Main Anchor |
500#reducer |
1pcs |
15 |
|
Winch of anchor line |
3KW |
4set |
12 |
|
Water pump |
7.5KW |
1pcs |
7.5 |
|
Centrifugal pump |
7.5KW |
1pcs |
7.5 |
|
Sand pump |
4inch |
1pcs |
11 |
|
Electricity cabint |
Including the electricity wire to machine |
1set |
- |
|
Power |
Power170KW(advise to use230KW generate set) |
- Mobile gold car gold mining machine on manufactruing
- Fixed gold mining machine 300 m3/hour alluvial gold mining
- The gold mining equipment mobile concentrator car send to Indonesia
- Affect reason rock gold mine fully crushing&grinding
- The gold mine and separating in Democratic republic of Congo
- Work capacity 100-150ton/hour vibrating gold mining machine
- Stationary type vibrating screen gold mining machine
- Desert gold mining machine dry gold separating plant
- Container Loading:Mobile gold mining machine send
产品分类
/PRODUCTS推荐产品
/PRODUCTS推荐文章
/NEWS- Facts About Environmental Equipment
- To Focus on the Wearing Parts of Roller Crusher
- Some Tips to the Application of the Lubrication of Impact Crusher
- The Development of VSI Crusher Solves the Shortage of the Artificial Sand
联系我们
/CONTACTQingzhou Guancheng Heavy Industrial Machinery Co.,Ltd.
+86 536 3593111
地址:Dongjiande Village, Huanglou Street Office, Qingzhou, Shandong, China (Mainland)
电话:+86 536 3593111
传真:+86 536 3593111
手机:+86 15653473333,15053659999
Email:1592999333@qq.com