Dredging depth15-18m capacity 100-150ton/hour gold&diamond mining machine
Brief introduction-Gold mining machine,Dredger
This set of dredging depth15-18m capacity 100-150ton/hour gold&diamond mining dredger machine is customized for customer.
High recovery with the gold particle(including invisible gold),this machine with high technology,new design and low maintenance.The PLC control automatic discharge gold concentrator is our main production,it can work in high recovery and reduce human work.
Horizontal gold concentrator |
Vertical gold concentrator |
|
The system |
PLC conctrol |
Handling control |
Discharging |
Automatic discharge |
Handling discharge |
The shaft |
Horizontal(shaft 2sides fixed) |
Vertical(buttom sidefixting) |
Working |
Long(working life) |
Normal(working life) |
The installation |
No need seeking ground level |
Need seeking ground level |
Feeding |
Sand pump(easily control the feeding concentration |
By gravity feeding(cann’t control the feeding concentration) |
Recovery |
Above 90% |
70% |
Application field |
Good peformance in jolting surrounding such as mobile |
Cann’t work in jolting surroundings. |
Biggest capacity model |
1200# or bigger capacity need customized |
80# |
Detail Parameter-Gold mining machine,Dredger
Production Name |
Specification |
Power |
Quantity |
Unit price |
Total price |
Remark |
|
Pontoon |
LOA(length):35.6m,single width:1.8mHeight:1.02m |
- |
1set |
||||
Hoisting gantry |
- |
1pcs |
|||||
Bucket system |
Bucket |
Model70# |
37 |
1set |
Chain:164pcs,about 40KG/pcs,single thickness 3CM,total thickness 9CM |
||
Chain |
Material:Cast steel |
||||||
Big Arms |
Total length 29.5m,2section |
||||||
Pentagon wheel |
|||||||
Square wheeel |
|||||||
Holding frames |
Material:20#H steel |
||||||
The engine |
Reducer:850# |
||||||
Reamertrommel screen |
Trommel screen |
Inner diameter 1.3m,outer diameter 1.6m,screen mesh 3m |
11 |
1set |
|||
Feed hopper |
With 8mm thickness steel |
||||||
Holding frames |
15#square pipes |
||||||
Transport conveyor |
5.5 |
1pcs |
|||||
Winch of Arms |
15 |
1pcs |
|||||
Main Anchor |
5.5 |
1pcs |
|||||
Sheet Anchor |
3KW*4 |
4pcs |
|||||
Water Pump |
7.5*2 |
2set |
|||||
The Gravity separating machine |
7.5 |
1set |
|||||
Gold concentrator |
80#Horizontal automatic discharge |
10.5 |
1set |
PLC control |
|||
Centrifugal pump |
5.5 |
1set |
|||||
Sand pump and location box |
Feeding for gold concentrator,4inch |
11 |
1set |
||||
Totowal power |
About 140KW |
- Mobile gold car gold mining machine on manufactruing
- Fixed gold mining machine 300 m3/hour alluvial gold mining
- The gold mining equipment mobile concentrator car send to Indonesia
- Affect reason rock gold mine fully crushing&grinding
- The gold mine and separating in Democratic republic of Congo
- Work capacity 100-150ton/hour vibrating gold mining machine
- Stationary type vibrating screen gold mining machine
- Desert gold mining machine dry gold separating plant
- Container Loading:Mobile gold mining machine send
产品分类
/PRODUCTS推荐产品
/PRODUCTS推荐文章
/NEWS- Facts About Environmental Equipment
- To Focus on the Wearing Parts of Roller Crusher
- Some Tips to the Application of the Lubrication of Impact Crusher
- The Development of VSI Crusher Solves the Shortage of the Artificial Sand
联系我们
/CONTACTQingzhou Guancheng Heavy Industrial Machinery Co.,Ltd.
+86 536 3593111
地址:Dongjiande Village, Huanglou Street Office, Qingzhou, Shandong, China (Mainland)
电话:+86 536 3593111
传真:+86 536 3593111
手机:+86 15653473333,15053659999
Email:1592999333@qq.com