HOME>NEWS>Product Knowledge>Work capacity 150-200m3/h alluvial gold mining machine

Work capacity 150-200m3/h alluvial gold mining machine

gold mining machine

Work capacity 150-200m3/h alluvial gold mining machine

Technical process-Gold mining machine,mining machinery
The raw material into feed hopper by excavator,then high pressure water swilling into reamers trommel screen to be classified into 2size,the big one ans small one,the one in big size into one fixed gold sluice with carpet,the scrap get rid into the scrap pool;
The material in small size into mineral dewater machine by sand pump ,then into mineral box sending to 1200#automatic discharge gold concentrator to be separating finally the concentrate get from concentrate discharge pipe and scrap to get rid into scrap pool.  
Detail Parameter-Gold mining machine,mining machinery


 Production


 Specification


 Quantity


 Power


 Unit price

 

Total price


 Remark


 Feed hopper

3500*5500  Material:10mm thickness steel

1pcs

-


 Trommel screen

Reamers trommel screen 
Inner 1.3m(punching technology),outer diameter 1.6m,screen mesh 3m,including reamers all over the trommel,double chain driving;Central+sides water supplying

1set

7.5

including the hopper,holding frames

Mineral desliming machine

2000*3800

1pcs

4.4

Polyurethane screen mesh

Gold concentrator

1200#automatic discharge concentrator

1pcs

21.5

PLC control


 Mineral box and sand pump

 

4inch sand pump

2set

22


 Centrifugal  pump

1pcs

5.5


 Submerged pump

5.5KW

2set

11


 Electric box

 

including the electric wire to machine,excluding the cable

1pcs

-


 Total power

71.9KW

产品分类

/PRODUCTS

推荐产品

/PRODUCTS

联系我们

/CONTACT

Qingzhou Guancheng Heavy Industrial Machinery Co.,Ltd.

+86 536 3593111

地址:Dongjiande Village, Huanglou Street Office, Qingzhou, Shandong, China (Mainland)

电话:+86 536 3593111

传真:+86 536 3593111

手机:+86 15653473333,15053659999

Email:1592999333@qq.com

Qingzhou Guancheng Heavy Industrial Machinery  Co.,Ltd.鲁ICP备09020970号-29
鲁ICP备09020970号-29